TreeAlive
‹ Base Mérimée: Monuments historiques, France

Base Mérimée: Monuments historiques · France

Bassin de radoub, situé dans le port de Saint-Pierre

Saint-Pierre, La Réunion, France

The record

Designation
Historic monument, registered (inscrit)
Protection
inscrit MH
Extent of protection
Le bassin de radoub en totalité (cad. domaine public, non cadastré, voisin de la parcelle DV 190) : inscription par arrêté du 12 janvier 2006
Protection dates
2006/01/12 : inscrit MH
Type
bassin de radoub
Main period of construction
2e moitié 19e siècle
Ownership
propriété de la commune
Commune
Saint-Pierre
Département
La Réunion
Region
La Réunion
Country
France
Coordinates
-21.34420, 55.47462
Mérimée reference
PA97400080

Get directions ↗

This record on the Ministère de la Culture's POP platform ↗

The Ministère de la Culture's notice

En 1854 débutent les travaux du port de Saint-Pierre, sous l'impulsion du gouverneur Hubert Delisle. Le premier projet consiste à aménager deux jetées et un épi afin d'abriter de la houle les deux bassins naturels. Ces travaux étant insuffisants, le creusement d'une nouvelle darse abritée est envisagé, nécessitant le percement de la plaque corallienne. Le creusement du chenal d'accès est achevé en 1883, date de l'inauguration du port qui peut accueillir des navires de 4, 5m de tirant d'eau. A partir de 1886, des travaux permettent au port d'accueillir douze voiliers de cinq cents tonneaux. En marge du port est établie une forme de radoub, bassin creusé pour l'entretien et la réparation de la coque des bateaux. Pour mettre à sec la forme, l'entrée du bassin était bouchée et des pompes évacuaient l'eau pour permettre les réparations.

English translation

The text above is the record as published by the Ministère de la Culture, in French. The English below is a machine translation made by TreeAlive, not by the Ministère de la Culture; it has not been checked by a person. Where the two differ, the original is the record. Report a translation error: privacy@treealive.com

In 1854 work began on the port of Saint-Pierre, under the impetus of governor Hubert Delisle. The first project consisted of constructing two jetties and a spur to shelter the two natural basins from swell. These works being insufficient, the excavation of a new sheltered dock was envisaged, requiring the piercing of the coral plate. The excavation of the access channel was completed in 1883, the date of the inauguration of the port which could accommodate ships with a draught of 4.5m. From 1886, works enabled the port to accommodate twelve sailing ships of five hundred tons. At the edge of the port a dry dock was established, a basin dug for the maintenance and repair of ship hulls. To dry out the dock, the entrance to the basin was sealed and pumps evacuated the water to permit repairs.

Nearby in the register

Other entries of the same register within about three miles of this one, by straight line.

Base Mérimée, Ministère de la Culture, data last updated 2026-09-17, reused under the Licence Ouverte / Open Licence 2.0 (Etalab). Record text is reproduced unchanged. Ministère de la Culture · Licence Ouverte 2.0
See your own family's places on a living map