TreeAlive
‹ Base Mérimée: Monuments historiques, France

Base Mérimée: Monuments historiques · France

Pont sur l'Hérault

Gignac, Hérault, France

The record

Designation
Historic monument, registered (inscrit)
Protection
inscrit MH
Extent of protection
Pont sur l'Hérault : inscription par arrêté du 29 décembre 1950
Protection dates
1950/12/29 : inscrit MH
Type
pont
Main period of construction
4e quart 18e siècle, 1er quart 19e siècle
Dates
1776, 1810
Architect or builder
Garipuy François (maître de l'oeuvre)
Ownership
propriété de l'État
Commune
Gignac
Département
Hérault
Region
Occitanie
Country
France
Coordinates
43.65368, 3.53568
Mérimée reference
PA00103463

Slide toward Today to fade the historical sheet and see the modern map underneath.

David Rumsey Map Collection, Stanford Libraries

5 historical maps cover this location, the earliest the 1750 map "Composite 15: Carte de France." (David Rumsey Map Collection, Stanford Libraries).

Get directions ↗

This record on the Ministère de la Culture's POP platform ↗

The Ministère de la Culture's notice

Un ancien pont existait à cet emplacement. Une chronique de 1675 indique qu'il fut emporté par une crue trois cents ans auparavant et qu'il n'en restait plus qu'une arche. Le nouveau pont fut construit au même emplacement. Le projet de l'ingénieur François Garipuy fut accepté en 1774. Les travaux furent interrompus de 1790 à 1803 et achevés en 1807. L'ouvrage se divise en trois arches. L'arche centrale est en anse de panier à trois centres, surbaissée au tiers. L'archivolte présente deux ressauts. Les arches latérales sont en plein cintre. L'appareil, différent de celui de l'arche centrale, est à bossages et refends. Le garde-corps est une tablette bombée. Primitivement, des chasse-roues en quart-de-cercle avaient été établis au long des parapets de l'arche centrale.

English translation

The text above is the record as published by the Ministère de la Culture, in French. The English below is a machine translation made by TreeAlive, not by the Ministère de la Culture; it has not been checked by a person. Where the two differ, the original is the record. Report a translation error: privacy@treealive.com

An old bridge existed at this location. A chronicle from 1675 indicates that it was swept away by a flood three hundred years previously and that only one arch remained. The new bridge was built in the same location. The project of engineer François Garipuy was accepted in 1774. Work was interrupted from 1790 to 1803 and completed in 1807. The structure is divided into three arches. The central arch is in basket-handle form with three centres, depressed to one third. The archivolt presents two projections. The lateral arches are round-arched. The masonry, different from that of the central arch, has bosses and rebates. The guard-rail is a convex tablet. Originally, quarter-circle wheel guards had been established along the parapets of the central arch.

Nearby in the register

Other entries of the same register within about three miles of this one, by straight line.

Base Mérimée, Ministère de la Culture, data last updated 2026-09-17, reused under the Licence Ouverte / Open Licence 2.0 (Etalab). Record text is reproduced unchanged. Ministère de la Culture · Licence Ouverte 2.0
See your own family's places on a living map