TreeAlive
‹ Base Mérimée: Monuments historiques, France

Base Mérimée: Monuments historiques · France

Ancien pont

Montauban, Tarn-et-Garonne, France

The record

Designation
Historic monument, classified (classé)
Protection
classé MH
Extent of protection
L'ancien pont : classement par arrêté du 15 décembre 1911
Protection dates
1911/12/15 : classé MH
Type
pont
Main period of construction
14e siècle
Ownership
propriété de l'État
Commune
Montauban
Département
Tarn-et-Garonne
Region
Occitanie
Country
France
Coordinates
44.01697, 1.34991
Mérimée reference
PA00095834

Slide toward Today to fade the historical sheet and see the modern map underneath.

David Rumsey Map Collection, Stanford Libraries

5 historical maps cover this location, the earliest the 1742 map "Languedoc, occidentale." (David Rumsey Map Collection, Stanford Libraries).

Get directions ↗

This record on the Ministère de la Culture's POP platform ↗

The Ministère de la Culture's notice

Pont entièrement en briques, construit entre 1304 et 1335. L'ouvrage était autrefois surmonté de trois tours, celles des extrémités étant carrées et celle du milieu, qui était élevée sur l'arrière-bec d'aval, était triangulaire. Il se compose de sept arches ogivales de 22 mètres de largeur et de sept piles munies d'avant-becs. Des ouvertures sont ménagées au-dessus des éperons pour faciliter le passage des eaux de crues. En 1831, suppression des parapets en briques pour permettre l'élargissement des trottoirs. D'autres travaux furent réalisés en 1869. Le pont a été élargi par des encorbellements à consoles en doucine.

English translation

The text above is the record as published by the Ministère de la Culture, in French. The English below is a machine translation made by TreeAlive, not by the Ministère de la Culture; it has not been checked by a person. Where the two differ, the original is the record. Report a translation error: privacy@treealive.com

Bridge entirely of brick, built between 1304 and 1335. The structure was formerly surmounted by three towers, those at the ends being square and that in the middle, which was raised on the downstream cutwater, being triangular. It consists of seven ogival arches of 22 metres in width and seven piles furnished with cutwaters. Openings are made above the spurs to facilitate the passage of floodwaters. In 1831, the removal of brick parapets to allow the widening of the pavements. Other works were carried out in 1869. The bridge was widened by corbelled projections with cyma consoles.

Nearby in the register

Other entries of the same register within about three miles of this one, by straight line.

Base Mérimée, Ministère de la Culture, data last updated 2026-09-17, reused under the Licence Ouverte / Open Licence 2.0 (Etalab). Record text is reproduced unchanged. Ministère de la Culture · Licence Ouverte 2.0
See your own family's places on a living map