Stelling, Ten noorden en langs de A12 en het Werk aan de Roode Haan Overberg (Utrechtse Heuvelrug 26)

Overberg, Utrecht, Netherlands

The record

Designation
National monument (rijksmonument)
Class
Open verdedigingswerk
Function
Stelling
Category
onroerend gebouwd
Built
1745 - 1746
Address
Ten noorden en langs de A12 en het Werk aan de Roode Haan Overberg (Utrechtse Heuvelrug 26)
Place
Overberg
Municipality
Utrechtse Heuvelrug
Province
Utrecht
Country
Netherlands
Coordinates
52.04728, 5.50766
Part of complex
528631
Monument number
528632

Slide toward Today to fade the historical sheet and see the modern map underneath.

University Library, Vrije Universiteit Amsterdam

5 historical maps cover this location, the earliest the 1714 map "L' Utrecht" (David Rumsey Map Collection, Stanford Libraries).

Get directions ↗

This monument in the Rijksdienst voor het Cultureel Erfgoed's register ↗

The register's description

Inleiding:

De Grebbelinie is een waterlinie van ca. 60 kilometer lengte, die gebruik maakt van de natte omstandigheden in de westelijke, laagst gelegen deel van de Gelderse Vallei. Het is een uniek voorbeeld van een aanleg van een waterlinie uit de achttiende eeuw. Doordat sindsdien geen grote ingrepen hebben plaatsgevonden in de structuur van de linie is het grootste deel van de liniewal, de keerkaden en de aarden verdedigingswerken bewaard gebleven. Dit gedeelte van de liniedijk is gelegen in de voormalige gemeente Amerongen.

Omschrijving:

In 1745 en 1746 aangelegd aarden VERDEDIGINGSWERK, bestaande uit een aarden wal, aangelegd als verdedigingswal.

Het gedeelte van de Liniedijk in de voormalige gemeente Amerongen (thans gemeente Utrechtse Heuvelrug) is ongeveer 3000 meter lang. Het is gelegen tussen het Werk aan de Roode Haan en de voormalige grens met de gemeente Leersum. De Liniedijk is niet onder profiel, maar de contouren van de liniedijk zijn op de meeste plaatsen goed herkenbaar. Op de plek waar de linie de A12 kruist is deze afgegraven. In 1937-1939 is dit gedeelte van de liniedijk opgehoogd met grond uit het Valleikanaal. In 1939-1940 is hier in het kader van de versterking van de Valleistelling een aantal kazematten gebouwd

Waardering:

De aanleg is van algemeen belang vanwege:

Cultuurhistorische waarden als onderdeel van de Grebbelinie, zoals deze in een periode van 200 jaar in zes fasen is aangelegd. Van groot belang door de herinneringswaarde vanwege de rol tijdens de gevechtshandelingen in 1939-1940.

Architectuurhistorische waarden in het bijzonder als uiting van de militair-strategische bouwkunde, die gebaseerd is op:

a: et systeem van inundatie en accesverdediging (18de, 19de en 20ste eeuw), b: het systeem van 'levende' veldversterking in de diepte (20ste eeuw) c. de voorpostfunctie tijdens de mobilisatie en oorlogshandelingen 1939 - 1940

Het betreft hier een complex dat in eerste aanleg een voorbeeld is van verdedigingswerken uit de periode: fase 1: vanaf 1744, aanleg liniedijk en werken

Ensemble waarde vanwege zijn ligging binnen het systeem van de Grebbelinie in het algemeen, in het bijzonder als onderdeel van de nog gaaf bewaarde liniedijk tussen het Werk aan de Roode Haan en de kern van de gemeente Leusden. Tevens vanwege de functionele en fysieke samenhang van de onderdelen van het complex. Tenslotte is hier sprake van een gave/redelijk gave relatie met het schootsveld en inundatieveld

Het complex is zeldzaam omdat het een nog vrijwel compleet bestaand voorbeeld is van een 18e eeuws verdedigingswerk in de Grebbelinie en het is als zodanig representatief (karakteristiek) voor dit type verdedigingswerken.

De liniedijk is goed bewaard omdat nog vrijwel alle ertoe behorende onderdelen in meer of minder herkenbare vorm en functie aanwezig zijn.

English translation

The text above is the record as published by the Rijksdienst voor het Cultureel Erfgoed, in Dutch. The English below is a machine translation made by TreeAlive, not by the Rijksdienst voor het Cultureel Erfgoed; it has not been checked by a person. Where the two differ, the original is the record. Report a translation error: privacy@treealive.com

Introduction:

The Grebbelinie is a water line approximately 60 kilometres in length, which makes use of the wet conditions in the western, lowest-lying part of the Gelderse Vallei. It is a unique example of the construction of a water line from the eighteenth century. Since no major interventions have taken place in the structure of the line, the majority of the line embankment, the revetments and the earthen defensive works have been preserved. This section of the line dike is located in the former municipality of Amerongen.

Description:

In 1745 and 1746 constructed earthen DEFENSIVE WORK, consisting of an earthen embankment, constructed as a defensive embankment.

The section of the Liniedijk in the former municipality of Amerongen (now municipality of Utrechtse Heuvelrug) is approximately 3000 metres long. It is located between the Werk aan de Roode Haan and the former boundary with the municipality of Leersum. The Liniedijk is not under profile, but the contours of the line dike are clearly recognizable in most places. At the point where the line crosses the A12 it has been excavated. In 1937-1939 this section of the line dike was raised with soil from the Valleikanaal. In 1939-1940 a number of casemates were built here within the framework of the strengthening of the Valleistellung.

Valuation:

The construction is of general importance because of:

Cultural-historical values as part of the Grebbelinie, as this was constructed over a period of 200 years in six phases. Of great importance because of its commemorative value because of its role during the combat operations in 1939-1940.

Architectural-historical values in particular as an expression of military-strategic construction, which is based on:

a: the system of inundation and access defence (18th, 19th and 20th centuries), b: the system of 'living' field fortification in depth (20th century) c. the advance post function during mobilization and combat operations 1939-1940

This concerns a complex which in its initial construction is an example of defensive works from the period: phase 1: from 1744, construction of line dike and works

Ensemble value because of its location within the system of the Grebbelinie in general, in particular as part of the well-preserved line dike between the Werk aan de Roode Haan and the core of the municipality of Leusden. Also because of the functional and physical coherence of the components of the complex. Finally, there is a well-preserved/reasonably well-preserved relationship with the field of fire and inundation field.

The complex is rare because it is still an almost completely surviving example of an 18th-century defensive work in the Grebbelinie and as such is representative (characteristic) of this type of defensive work.

The line dike is well preserved because almost all the components belonging to it are still present in more or less recognizable form and function.

Nearby in the register

Other entries of the same register within about three miles of this one, by straight line.

Rijksmonumentenregister data: Rijksdienst voor het Cultureel Erfgoed, released under CC0 1.0. Record text is reproduced unchanged. Rijksdienst voor het Cultureel Erfgoed · CC0 1.0
See your own family's places on a living map