TreeAlive
‹ Base Mérimée: Monuments historiques, France

Base Mérimée: Monuments historiques · France

Poste d’aiguillage n°2

Chagny, Saône-et-Loire, France

The record

Designation
Historic monument, registered (inscrit)
Protection
inscrit MH
Extent of protection
En totalité, le poste d’aiguillage n°2, situé route de Rémigny et assis sur la parcelle n°191 figurant au cadastre section BN : inscription par arrêté du 29 mai 2020
Protection dates
2020/05/29 : inscrit MH
Type
aiguillage
Ownership
propriété privée
Address
Route de Rémigny
Commune
Chagny
Département
Saône-et-Loire
Region
Bourgogne-Franche-Comté
Country
France
Coordinates
46.90905, 4.74640
Mérimée reference
PA71000094

Slide toward Today to fade the historical sheet and see the modern map underneath.

David Rumsey Map Collection, Stanford Libraries

5 historical maps cover this location, the earliest the 1759 map "84 Autun." (David Rumsey Map Collection, Stanford Libraries).

Get directions ↗

This record on the Ministère de la Culture's POP platform ↗

The Ministère de la Culture's notice

Installé sur la ligne Paris-Lyon inaugurée en 1849, la gare de Chagny est exploitée par la Compagnie des chemins de fer de Paris à Lyon et à la Méditerranée (Cie PLM). Les équipements ferroviaires sont nombreux à Chagny, deux gares de voyageurs, une gare de marchandises, un centre de triage, un dépôt et une rotonde. Un premier poste d'aiguillage en bois est construit au XIXe siècle par la Cie PLM. Ce poste est remplacé dans les années 1930 par le poste d'aiguillage n°2, à la structure en béton et remplissage de briques, caractéristique des modèles de la Cie PLM. Ce poste est équipé d'un système d'aiguillage Saxby, complété dans les années 1950 d'un poste plus moderne. Le poste d'aiguillage n°2 est en fonctionnement jusqu'en 2016.

Le poste d'aiguillage n°2 de Chagny est installé en bordure de la voie ferrée au nord de la gare de Chagny. L'édifice de plan rectangulaire est élevé sur trois niveaux, le dernier niveau en léger surplomb lui confère la caractéristique des postes d'aiguillage dominant les voies. La structure est en béton avec remplissage de briques rouges. Le toit en béton est arrondi et débordant. De larges baies sont ouvertes au dernier niveaux permettant d'observer les voies. Le rez-de-chaussée était occupé par les installations électriques. Le deuxième étage contient les leviers du système Saxby, dont les transmissions descendent à travers le premier étage jusqu'au rez-de-chaussée. Au-dessus des leviers, un tableau de contrôle optique reproduit un schéma des voies concernées. Le meuble du poste moderne est démonté.

English translation

The text above is the record as published by the Ministère de la Culture, in French. The English below is a machine translation made by TreeAlive, not by the Ministère de la Culture; it has not been checked by a person. Where the two differ, the original is the record. Report a translation error: privacy@treealive.com

Located on the Paris-Lyon line inaugurated in 1849, Chagny station is operated by the Compagnie des chemins de fer de Paris à Lyon et à la Méditerranée (Cie PLM). Railway facilities are numerous at Chagny, with two passenger stations, a freight station, a marshalling yard, a depot and a roundhouse. A first wooden signal box is built in the 19th century by Cie PLM. This signal box is replaced in the 1930s by signal box n°2, with a concrete structure and brick infill, characteristic of Cie PLM models. This signal box is equipped with a Saxby signalling system, supplemented in the 1950s by a more modern signal box. Signal box n°2 remains in operation until 2016.

Signalling post no. 2 at Chagny is installed on the edge of the railway line north of Chagny station. The building with rectangular plan is raised on three levels, the last level in slight overhang gives it the characteristic of signalling posts overlooking the lines. The structure is in concrete with red brick infill. The concrete roof is rounded and overhanging. Large openings are opened on the last level allowing observation of the lines. The ground floor was occupied by electrical installations. The second floor contains the levers of the Saxby system, whose transmissions descend through the first floor to the ground floor. Above the levers, an optical control panel reproduces a diagram of the lines concerned. The modern post equipment is dismantled.

Nearby in the register

Other entries of the same register within about three miles of this one, by straight line.

Base Mérimée, Ministère de la Culture, data last updated 2026-09-17, reused under the Licence Ouverte / Open Licence 2.0 (Etalab). Record text is reproduced unchanged. Ministère de la Culture · Licence Ouverte 2.0
See your own family's places on a living map