Kokemäenjoen voimalaitokset

Sastamala, Pirkanmaa, Finland

The record

Type
Nationally significant built cultural environment (RKY)
Elements (as the agency lists them)
silta, työväen asuintalo, voimalaitos
Character (as the agency lists it)
taajama
Municipality
Sastamala
Region
Pirkanmaa
Country
Finland
Coordinates
61.32704, 22.84661
Pin
Placed by TreeAlive at the centre of the largest area the agency maps
RKY number
1969

Slide toward Today to fade the historical sheet and see the modern map underneath.

Bibliothèque nationale de France (Gallica)

The 1666 map covering this location: "Finlande Septentr.le, et Merid.le, Nylande, et Tavasthus" (Bibliothèque nationale de France (Gallica)).

Historical maps covering this location

  • 1666 · Finlande Septentr.le, et Merid.le, Nylande, et Tavasthus (Bibliothèque nationale de France (Gallica))

Get directions ↗

This area in the Finnish Heritage Agency's RKY inventory ↗

The Finnish Heritage Agency's description

Kokemäenjoen varrelle eri vuosikymmeninä rakennetut, nimekkäiden teollisuusarkkitehtien suunnittelemat ja arkkitehtuuriltaan korkeatasoiset voimalaitokset kuvastavat koskivoiman käyttöä kasvavan sähköntuotannon tarpeisiin 1900-luvun kuluessa.

Yli 120 kilometriä pitkän, Pirkanmaalta Vammalan Liekovedestä alkavan ja Satakunnassa Porin kohdalla Selkämereen laskevan Kokemäenjoen koskiin on rakennettu 1900-luvun kuluessa useita maisemallisiksi kiintopisteiksi muodostuneita vesivoimalaitoksia.

Pirkanmaan puolella merkittävimmät Kokemäenjokivarren voimalaitokset ovat Tyrvään ja Äetsän voimalaitokset. Samaan ryhmään kuuluu Satakunnan puolella 1939 arkkitehti Erik Bryggmanin suunnitelmin valmistunut Harjavallan suurvoimalaitos Nakkilan ja Harjavallan rajalla sijaitsevassa koskessa.

Tyrvään voimalaitos on rakennettu Kokemäenjoen alkukohtaan Hartolankoskeen, Liekoveden eteläpäähän. Vanhat rantaviivaan rakennetut voimalat vuosilta 1906 ja 1913 ovat rantaviivan siirryttyä jääneet kuivalle maalle. Tyrvään Voimaosakeyhtiön rakennuttama pelkistetyn rationalistinen, tiilirakenteinen voimalaitos on vuodelta 1951. Voimalaitoksen patoa kulkeva tie yhdistää Kaukolan ja Tyrvään kylät. Voimalamiljööseen liittyy Hiidenmäen länsirinteeseen voimalaitoksen henkilökunnalle rakennettu asuinalue. Maisemallisesti keskeisen voimalan yläpuolella avautuu järvimaisema ja alapuolella on jyrkkärantainen jokiuoma, jonka etelärannalla on puistoalue.

Punatiilinen Äetsän voimalaitos on rakennettu 1920-luvulla Meskalankoskeen varmistamaan sähköntoimitus 1890-luvun lopulla perustetulle Äetsän tehtaille, myöhemmin Finnish Chemicals Oy:lle. Rationalistishenkinen voimalaitos on Anjalankosken Inkeroisten ohella toinen pääasiassa arkkitehti Sigurd Frosteruksen suunnittelemista voimalaitoksista. Tiilestä muurattujen rakennusosien alapuoliset perustus- ja patorakennelmat ovat hakattua kiveä ja betonia. Suuressa konehallissa on seitsemän turbiinia, jotka ovat edelleen käyttökunnossa. Voimalan patokorkeus on 5,9 metriä. Voimalamiljööseen kuulu myös uudempi 1990-luvulla käyttöönotettu, kokonaan kallioon louhittu automatisoitu koneasema. Voimalaitoksen itäpuolella Kokemäenjoen ylittää maan pisin puurakenteinen riippusilta, joka on rakennettu 1948 Keikyän kunnan ja Finnish Chemicals Oy:n rahoituksella. Voimalaitos ja riippusilta korkeine tukipylväineen ja vaijerikaarineen leimaavat vahvasti jokivarren maisemaa.

Äetsän ja Tyrvään voimalaitokset sijaitsevat valtakunnallisesti arvokkaalla Kokemäenjokilaakson maisema-alueella.

Kokemäen koskivoimaa hyödynnettiin vuosisatojen ajan myllyjen toiminnassa ennen voimalaitosten ja niiden patolaitteiden rakentamista. Vanhimmat Kokemäenjoen voimalat sijoitettiin myllyjen tapaan rantavirtaan. Myös Tyrvään Hartolankoski oli vuosisatoja myllypaikkana ja Tyrväänkylän puolelle sijoitetut ensimmäiset sähkövoimalaitokset vuosilta 1906 ja 1913 sijoittuivat rantavirtaan. Hartolankoski padottiin 1946-1950 ja siihen suunnitteli nykyisen voimalaitoksen arkkitehti Jarl Eklund.

Äetsän Meskalankoskeen valmistui ensimmäinen voimalaitos 1919-1921, jolloin yläjuoksun puolella oleva Äetsänkoski perattiin veden nostamiseksi. Äetsä oli ensimmäinen koko joen ylittävä voimalaitos. Äetsän voimalaitoksen rakentaminen liittyi 1900-luvun alun energiakriisiin. Kiviihiilen hinnannousu ja lisääntyvä voimantarve nosti vesivoimarakentamisen ajankohtaiseksi. Niinpä Porissa kivihiiltä voimanlähteenä käyttävän höyryvoimalaitoksen omistajan Oy Rosenlewin tytäryhtiö Björneborgs Kraft osti Keikyän Äetsän, Peevolan ja Meskalan kosket. Voimalaitoksen piirustukset tilattiin arkkitehtitoimisto Frosterus & Gripenbergiltä ja Äetsän voimalaitoksen mittava rakennustyö ajoittui pääasiallisesti vuosiin 1921-1923. Muuraustiilet toimitti Rosenlewin oma tiilitehdas Porin Ulasoorissa. 1990-luvulla louhittiin padon eteläpuolelle uusi uoma tehokkaamman hyötysuhteen saavuttamiseksi ja siihen sijoitettu, oululaisen Uki Arkkitehdit Oy:n suunnittelema uusi voimalaitos otettiin käyttöön 1996.

V.M. Vahervuori, Äetsän voimalaitos. Teknillinen aikakauslehti 1921:3.

Gunnar E. Lax, Suomen rakennettu vesivoima vuoteen 1947 mennessä. Voima ja valo 1946:12.

Mikko Nordquist, Tyrvään uusi vesivoimalaitos. Voima ja valo 1951:5-6.

Suomen teollisuuden arkkitehtuuria. Suomen arkkitehtiliitto. Helsinki 1952.

Raimo Salokangas et al. (toim.), Suomen vesivoima. Suomen vesivoimayhdistys. 1968.

Raimo Viikki, Suur-Huittisten historia III, 1990.

Kokemäen yläjuoksun maisema, Äetsän seudun maisemaselvityshanke osa 1. Arkkitehtitoimisto Lehto - Peltonen - Valkama Oy. s.l. s.a.

English translation (from the Finnish)

The text above is the record as published by the Finnish Heritage Agency (Museovirasto), in Finnish. The English below is a machine translation made by TreeAlive, not by the Finnish Heritage Agency (Museovirasto); it has not been checked by a person. Where the two differ, the original is the record. Report a translation error: privacy@treealive.com

Power plants built along the Kokemäenjoki river in different decades, designed by well-known industrial architects and of high architectural quality, reflect the use of waterpower to meet growing electricity needs during the 20th century.

The rapids of the Kokemäenjoki river, which is over 120 kilometres long, begins at Liekovesi in Vammala, Pirkanmaa, and flows into the Selkämeri at Pori in Satakunta. During the 20th century, several hydroelectric power plants were built on its rapids, and they have become landmarks in the landscape.

On the Pirkanmaa side, the most significant power plants along the Kokemäenjoki river are those at Tyrvää and Äetsä. The same group includes, on the Satakunta side, the large Harjavalta power plant, completed in 1939 to plans by Erik Bryggman, on the rapids located on the border between Nakkila and Harjavalta.

The Tyrvää power plant was built at the head of the Kokemäenjoki river, at Hartolankoski, at the southern end of Liekovesi. The old power houses from 1906 and 1913, built on the shoreline, have been left on dry land after the shoreline moved. The reduced rationalist, brick-built power plant built by Tyrvään Voimaosakeyhtiö dates from 1951. The road that runs along the dam of the power plant connects the villages of Kaukola and Tyrvää. The power plant setting also includes a residential area built for the power plant staff on the western slope of Hiidenmäki. Above the visually central power plant, a lake landscape opens up, and below it is a steep-banked river channel with a park area on its southern bank.

The red-brick Äetsä power plant was built in the 1920s at Meskalankoski to secure the electricity supply to the Äetsä factory, founded at the end of the 1890s and later known as Finnish Chemicals Oy. The rationalist-minded power plant is, along with the Inkeroinen one in Anjalankoski, one of the power plants designed mainly by architect Sigurd Frosterus. The foundation and dam structures below the brick-built parts are of hewn stone and concrete. The large machine hall contains seven turbines, which are still in working order. The dam height of the power plant is 5.9 metres. The power plant setting also includes a newer automated machine station, commissioned in the 1990s and excavated entirely into bedrock. On the east side of the power plant, the Kokemäenjoki is crossed by the longest timber-framed suspension bridge in the country, built in 1948 with funding from Keikyä municipality and Finnish Chemicals Oy. The power plant and the suspension bridge, with their tall support pylons and cable arches, strongly characterise the landscape of the riverside.

The Äetsä and Tyrvää power plants are located in the nationally valuable Kokemäenjokilaakso landscape area.

For centuries, before power plants and their dam structures were built, the waterpower of the Kokemäenjoki rapids was used to operate mills. The oldest power plants on the Kokemäenjoki were placed in the current along the riverbank, in the manner of mills. Hartolankoski in Tyrvää was also a mill site for centuries, and the first electric power plants, from 1906 and 1913, placed on the Tyrväänkylä side of the river were also located in the current along the riverbank. Hartolankoski was dammed in 1946-1950, and architect Jarl Eklund, who designed the current power plant, also designed the dam.

The first power plant at Meskalankoski in Äetsä was completed in 1919-1921, when the Äetsänkoski rapids on the upstream side were dredged to raise the water. Äetsä was the first power plant to span the entire river. The construction of the Äetsä power plant was linked to the energy crisis of the early 20th century. The rise in the price of bituminous coal and growing power demand made hydropower construction topical. Therefore Björneborgs Kraft, a subsidiary of Oy Rosenlew, which owned a steam power plant in Pori that used bituminous coal as its energy source, bought the Äetsä, Peevola and Meskala rapids in Keikyä. The drawings for the power plant were ordered from the architectural office Frosterus & Gripenberg, and the extensive construction work on the Äetsä power plant took place mainly in 1921-1923. The masonry bricks were supplied by Rosenlew's own brick factory at Ulasoori in Pori. In the 1990s a new channel was excavated south of the dam to achieve greater efficiency, and the new power plant placed in it, designed by Oulu-based Uki Arkkitehdit Oy, was commissioned in 1996.

Nearby in the register

Other entries of the same register within about three miles of this one, by straight line.

Descriptions are shown with the written permission of the Finnish Heritage Agency and reproduced unchanged. Locations come from its open spatial data; pins are placed by TreeAlive. Finnish Heritage Agency (Museovirasto) · Spatial data: CC BY 4.0
See your own family's places on a living map