TreeAlive
‹ Cof Cymru: National Historic Assets of Wales, Wales

Cof Cymru: National Historic Assets of Wales · Wales

Vale of Neath railway cutting and tunnel portal

Troed-y-Rhiw, Merthyr Tydfil, Wales

The record

Designation
Scheduled monument
Site type
Railway
Period
Victorian
Date of designation
13 July 2017
Welsh name
Trychfa Rheilffordd Cwm Nedd a Mynedfa’r Twnnel
Community
Troed-y-Rhiw
Unitary authority
Merthyr Tydfil
Country
Wales
Coordinates (centre of the scheduled area)
51.72852, -3.38521
SAM number
GM606
Cadw record number
4337

Slide toward Today to fade the historical sheet and see the modern map underneath.

David Rumsey Map Collection, Stanford Libraries

Shown on 5 historical map sheets, the earliest the 1830 "V.3:11-15:XV. Britisches Reich. A. Kon: England. b. Frstenthum Wales: Shire: 37-40" (David Rumsey Map Collection, Stanford Libraries).

Get directions ↗

This record in Cadw's own full report ↗

Cadw's description

The monument comprises the remains of the Vale of Neath Railway Cutting and Tunnel Entrance, an important element of the nineteenth century Vale of Neath Railway, situated at Waunwyllt. The sides of the cutting are shelving and cut directly into the bedrock. The original single broad gauge track has been removed and the surviving trackbed just has the remains of the ballast present. The cutting runs SW for 140m from immediately west of the stone and iron over-bridge carrying the track to Waunwyllt to the eastern tunnel portal. This is made of coursed rough-faced Pennant sandstone. The entrance arch is framed by raking buttresses and the elliptical arch is made of 6 courses of yellow engineering brick. There is a broad stone band running above the arch and a heavy stone coping to the parapet. The Vale of Neath Railway, incorporated in 1846, was designed to connect Merthyr Tydfil and the heads of the western South Wales Valleys with the sea at Neath, and later to a purpose built dock at Briton Ferry. The engineer appointed was Isambard Kingdom Brunel who had first surveyed a route in 1835. The railway reached Aberdare in 1851, where work had started on the Merthyr Tunnel running for 2,495 yards under Aberdare Mountain. Construction proved very problematic and it took over 6 years and ruined two contractors before being completed by direct labour under the control of William Ritson. When finished in 1853 it was the longest railway tunnel in Wales, and it remains an unaltered example of a Brunel design.

The monument is of national importance for its potential to enhance and illustrate our knowledge and understanding of the development of the transport network in South East Wales in the nineteenth century. The cutting and tunnel are unaltered since their completion and represent one of the best examples of the work of Isambard Kingdom Brunel to survive in Wales. The portal and cutting are superb examples of Victorian engineering. The cutting, track bed and tunnel portal may be expected to contain archaeological information in regard to construction techniques and functional detail.

The scheduled area comprises the remains described and an area around it within which related evidence may be expected to survive. It is irregular in shape on plan and measures 166m from NE to SW by up to 38m transversely. The bridge abutment and associated embankment retaining walls are excluded from the scheduling.

Nearby in the register

Other entries of the same register within about three miles of this one, by straight line.

Designated Historic Asset GIS Data, The Welsh Historic Environment Service (Cadw), 2026-09-07, licensed under the Open Government Licence http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ Cadw, the Welsh Historic Environment Service · Open Government Licence v3.0
See your own family's places on a living map