Dromore Crossing,

Culmore/ Sedennan, Fermanagh and Omagh, Northern Ireland

The record

Designation
Record only (not listed)
Grade
Record Only
Type
Bridge
Date of construction
1840 - 1859
Address
Dromore Crossing,, Dromore Road,, Omagh,, Co Tyrone, BT78 1QZ
Townland
Culmore/ Sedennan
Council
Fermanagh and Omagh
Country
Northern Ireland
Coordinates
54.58919, -7.31488
Date of survey
13 February 2009
HB reference
HB11/11/013

Slide toward Today to fade the historical sheet and see the modern map underneath.

David Rumsey Map Collection, Stanford Libraries

Shown on 4 historical map sheets, the earliest the 1830 "V.3:11-15:XV. Britisches Reich. C. Kon: Ireland. b. Prov: Ulster. Counties: 13-21" (David Rumsey Map Collection, Stanford Libraries).

Get directions ↗

This record in the Department's Historic Buildings Record ↗

The Department's description

A single-span road bridge, built c.1850, carrying Dromore Road over railway line (now disused). Squared-and-snecked rockfaced basalt piers, splayed abutments, and parapet; rockfaced sandstone string course to carriageway level; squared sandstone rockfaced coping to parapet. A housing development has been constructed to the north-west. The ground level has been raised completely obscuring the façade. The North-west parapet has been removed. To north-east and south-west, curved retaining wall terminates in square pillar. Single segmental-headed arch with plain sandstone springing course and rusticated ashlar voussoirs. Soffit is vaulted red brick; rockfaced stone below springing course.

Setting:-
The carriageway is approximately 6m wide. Bridge is located on main road to south of Omagh; embankment to north-east and south-west. A housing development has been constructed to the north-west.

Roof N/A
Walling Basalt
Windows N/A
RWG N/A

This bridge first appears on the second edition map of 1854. The railway is captioned ‘Londonderry & Enniskillen Railway’. This has become the ‘Great Northern Railway (Ireland)’ by the third edition of 1905-6. By the fifth edition of 1964 the railway has gone.

McCutcheon comments on the development of the Londonderry & Enniskillen Railway,“The Londonderry & Enniskillen Railway Company was incorporated in 1845, authorised to construct a single-track line of railway extending southwards from a Londonderry terminus…Work began soon afterwards and by April 1847 the single-track line had reached Strabane…The cost of construction was relatively low, about £10,000 per mile…However, due to the shortness of the line, storm damage…and competition from the Strabane Canal and Foyle Navigation, this first section of the company’s line was not a great commercial success. It was not until the construction of the line to Omagh, reached in 1852, Fintona (1853) and Enniskillen (1854) that the full benefits of the railway became apparent. Undoubtedly the new line of rail communication brought important commercial advantages to the towns which it served, and indirectly, to the agricultural lands, both arable and pastoral in character, lying along the valleys of the Foyle, its headstreams and tributaries, and to the flanking upland areas to both east and west. Omagh and Strabane, in particular, emerged as major market centres from which goods could be conveyed northwards to the port of Londonderry. ” (p.109-110)

The Londonderry and Enniskillen Railway eventually amalgamated with other lines, starting in 1860 when it was “leased to the Dundalk & Enniskillen Railway Company, subsequently the Irish North Western Railway Company, for 99 years …The INWR was absorbed by the Northern Railway Company on 1 January 1876 and this in turn merged with the Ulster Railway Company on 1 April 1876 to form the Great Northern Railway Company (Ireland).” (p.110-1)

During the post-war period the railways faced increasing competition from road transport and in 1953 the GNR ceased to exist as a separate and independent company. “In that year the entire system was acquired jointly by the Governments of Northern Ireland and the Republic of Ireland, and was subsequently operated by a Board consisting of representatives of the two governments. In 1958 the greatly diminished portion of the former Great Northern system which lay within Northern Ireland passed under the absolute control of the Ulster Transport Authority” A period of contraction followed in which many lines deemed to be unremunerative were closed down. (p.119)

References:

Primary Sources

1. PRONI OS/6/6/35/1 – First Edition Ordnance Survey Map (1833)
2. PRONI OS/6/6/35/2 – Second Edition Ordnance Survey Map (1854)
3. PRONI OS/6/6/35/3 – Third Edition Ordnance Survey Map (1906)
4. PRONI OS/6/6/35/4 – Fourth Edition Ordnance Survey Map (1935-7)
5. PRONI OS/6/6/35/5 – Fifth Edition Ordnance Survey Map (1964)

Secondary Sources

1. McCutcheon, W.A. “The Industrial Archaeology of Northern Ireland,” London: HMSO, 1980.

Not listed

Not listed

A single-span road bridge, built c.1850, carrying Laurel Road over Creevan Burn. This bridge, built during the mid-nineteenth century, at a time of expansion of the railway in the area, However, the north-west parapet has been removed and the ground level to the north-west has been raised to accommodate a housing development, completely obscuring this façade. There are other, better examples listed.

Nearby in the register

Other entries of the same register within about three miles of this one, by straight line.

Department for Communities, Historic Environment Division, Historic Buildings Record. Contains public sector information licensed under the Open Government Licence v3.0. Department for Communities, Historic Environment Division · Open Government Licence v3.0